Coastal living, thoughtfully built
Construction, in the open
Six phases. Three walkthroughs. Zero surprises.
A Harborlight semi-custom home takes eight to ten months from shovel to key. You'll walk the home with your superintendent at three fixed milestones, and your build portal posts photos every Friday — tide reports optional.
Typical timeline
- Foundation → framing
- Months 1–3
- Mechanicals → drywall
- Months 3–6
- Finishes → inspection
- Months 6–9
- Closing walkthrough
- Month 9–10
01
Pre-construction meeting
Plans, homesite, and every selection reviewed with your superintendent before ground breaks — including your structural options and elevation.

02
Foundation & site work
Footings engineered for coastal soils, waterproofed and third-party inspected before backfill. Trees flagged to stay, stay.

03
Framing
Kiln-dried lumber, hurricane strapping, engineered floor systems — squared, strapped, and inspected before it's wrapped.

04
Mechanicals & pre-drywall walk
Plumbing, electrical, and HVAC roughed in. You walk every cavity with your superintendent; we photograph all of it and hand you the album at closing.

05
Interior finishes
Your Design Studio selections arrive — cabinetry, counters, flooring, tile, trim — installed and checked against your selection sheet line by line.

06
Quality inspection & closing walk
A 200-point internal inspection, then your closing walkthrough: every system demonstrated, keys handed over, wall-cavity album included.

YOUR BUILD TEAM
Three names you'll know by heart
0–1
Sales Counselor
Contract, selections calendar, financing hand-off — your first call for anything.
1–10
Superintendent
Carries four homes at a time, not forty. Runs all three walkthroughs and your Friday photos.
1–10
Warranty Manager
30-day and 11-month visits on the calendar before you unpack — then a decade of coverage.